Progress
From first robot accuracy tests to energy-efficient tool handling in simulation: follow our progress towards precise robotic manufacturing.
Stage 3 of 8
- Done
- In progress
- Upcoming
Stage 1 of 8Done
Kick-off
The team came together at the Advanced Manufacturing Lab and defined the project scope.
Stage 2 of 8Done
Concept
We defined the requirements for the correction module and reviewed the project concept with our supervisors. The concept combines the robot’s reach with a compact device that corrects the tool’s position relative to the workpiece.
Early robot drawing and motion measurements provide a baseline for evaluating the precision enhancement as development progresses.
Updates

Weekly meeting
Every week the whole team meets to share progress and plan the next steps.
On our socials
Stage 3 of 8In progressNovember 2026
Design
We are turning the correction-module concept into detailed mechanical and electronic designs. Work on the mechanical design, mounting and control system is progressing alongside early prototypes and tests.
The humanoid now follows detected drawings while balancing. End-effector IMUs record acceleration and orientation so that we can characterize its motion before adding precision correction.
Our latest simulations explore how the robot can handle welding-tool loads in energy-efficient postures. Transferring these movements to the real robot and measuring the difference between simulation and hardware are the next steps.
Stage 4 of 8Upcoming
Prototype
Stage 5 of 8Upcoming
Validation on test rig
Stage 6 of 8Upcoming
Integration on humanoid
Stage 7 of 8Upcoming
Welding demonstrator
Stage 8 of 8Upcoming
Focus Rollout
Follow our journey
Weekly updates from the lab.